On 28 June 2012 11:15, Michael Maguire <michael.maguire@gmail.com> wrote:
[Cc'ing in Babettli]

Thanks for coming back so quickly. We'll review your notes tonight.

Cheers,
Michael

On 28 Jun 2012 10:30, "alex@adpol.nazwa.pl" <alex@adpol-gb.co.uk> wrote:
Hi Michael,
thank you for your email.

a/ i will correct this - add this door for final technical document;
b/ handle with key - note - done
c/ sliding door - as in offer - handle on internal side only - external only in-timber small pull recess
d/ http://winkhausdirect.co.uk/download/HelpOBVMountingInstructions.pdf this opening restrictor can be added
e/ the code for darker handle is f9 - described as steel colour - will point it out in the offer
f/ there is no trickle vents in the offer;
g/ i will ask in the factory how long it will take to make HS doors while waiting for  the final size; when do you expecting to have this steel frame errected?
h/ all fixed panels created as you requested;
j/ pos 2 - w3,w4 - correct and confirmed that it is the same glazing
k/ handle changed to left side
l/ if the door need to be in passive alurion profile with triple glazing - the fixed panel cannot be in different system - i think it can have doble glazing instead of triple - but it wont look nice - no connection between this two glazing while closed, don't you think? - i will correct the size of fixed panel/door
m/ pos 9 = OK
n/ pos 10 - is ESG glazing
o/ as pos 10 - pos 11 has ESG glass; handle changed to the right
p/ pos 12 - ok - changed
r/ pos 13 - ok
s/ pos 14 - ok
t/ pos 16 - glazing is ESG means that is secure;


1/ because of changing few positions to the passive alurion with triple glazing/from passive to eko68 - price may change - passive alurion with triple glazing are more expensive, i will send the corrections to PL and we will have exact price; will be corrected eventually with an annex to the contract - but we will do it after site visit - to avoid further changes etc;



regards. Alex